AMOUNT OF WORK COMPLETED 96786 Excavation works (м3) 174214 Transportation of ground,slag,crushed stone,construction waste (t) 2826 Brick masonry (м3) 63592 Continuous concrete and reinforced concrete (м3) 691 Erection of concrete prefabricated constructions and reinforced prefabricated constructions (м3) 11692 Erection of metal constructions (t) 208118 Anticorrosive protection of metal constructions (м2) 3173 Equipment erection (t) Contact... READ MORE
Project Description: Coke battery 10-bis with the technology of preparation of tamped charge in combination with the installation of dust-free coke (BVK) and installation of dry quenching of coke (DSTC) at PJSC Alchevsk Coke Plant. Annual production rate: 1.056 million tons of metallurgical coke per year. Normative term of construction: 48 months Actual period of construction: 22... READ MORE
Project Description Dry gasholder is designed for the accumulation, storage and delivery of gas to consumers. The gas-holder serves as a buffer capacity between the units that produce gas (blast furnaces, converter, coke batteries), and a combined-cycle plant (CCGT) and is built into the piping network created between them. The main functions performed by gasholders:... READ MORE
SCOPE OF THE PERFORMED WORKS 62736 Development of soil (m3) 128350 Transportation of soil, slag, rubble, debris (t) 6050 Destruction of rubble, concrete and reinforced concrete structures (m3) 53705 Anticorrosive protection of metal structures (m2) 3846 Installation of metal structures (t) 7876 The device pierreinjection piles (m3) Contact Us 87500, Ukraine,Donetsk region,Mariupol, Mira Ave, 68а... READ MORE
Description In June 2013, the first power unit of a combined cycle gas turbine power plant with a capacity of 303 MW (2 blocks of 151.5 MW) was commissioned at PJSC Alchevsk Iron and Steel Works. In Ukraine and the CIS it is the first station that allows to receive electricity by processing secondary energy... READ MORE
ОБЪЕМЫ ВЫПОЛНЕННЫХ РАБОТ 69527 РАЗРАБОТКА ГРУНТА (м3) 118978 ПЕРЕВОЗКА ГРУНТА, ШЛАКОВ, ЩЕБНЕй, СТРОИТЕЛЬНОГО МУСОРА (тонн) 874 УСТРОйСТВО СВАйНЫХ ОСНОВАНИй (м3) 14200 ЖЕЛЕЗОБЕТОННЫЕ ФУНДАМЕНТЫ (м3) 1366 МОНТАЖ МЕТАЛЛОКОНСТРУКЦИй (тонн) 299 МОНТАЖ СБОРНЫХ БЕТОННЫХ И ЖЕЛЕЗОБЕТОННЫХ КОНСТРУКЦИй (м3) 3130 КИРПИЧНАЯ КЛАДКА (м3) 706 МОНТАЖ ТЕХНОЛОГИЧЕСКИХ ТРУБОПРОВОДОВ (тонн) 3037 МОНТАЖ ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ (тонн)
SCOPE OF THE PERFORMED WORKS 307 DEMOLITION OF REINFORCED CONCRETE CONSTRUCTIONS (м3) 656 CONTINUOUS CONCRETE AND REINFORCED CONCRETE (м3) 13 INSTALLATION OF ANCHOR BOLTS (т) 2836 DEMOLITION OF TECHNOLOGICAL AND HYDRAULIC EQUIPMENT (т) 2223 ERECTION OF TECHNOLOGICAL AND HYDRAULIC EQUIPMENT (т) 65 LAYING OF CABLES (км)
SCOPE OF THE PERFORMED WORKS
SCOPE OF THE PERFORMED WORKS 1.ERECTION OF INDUCTRIAL PIPELINES AND EQUIPMENT 2.STRUTURAL STEEL ERECTION 3.ELECTRIC WORKS 4.START-UP AND COMISSIONING WORKS
DESCRIPTION OF FULFILLED WORKS 824074 EXCAVATION WORKS (м2) 819564 TRANSPORTATION OF GROUND, SLAG, CRUSHED STONE, CONSTRUCTION WASTE (T) 82704 DEMOLITION OF STONE, CONCRETE AND REINFORCED CONCRETE CONSTRUCTIONS (м3) 14554 BRICK MASONRY (м3) 27872 DISMOUNTING OF METAL CONSTRUCTIONS (т) 182191 CONTINUOUS CONCRETE AND REINFORCED CONCRETE (м3) 12304 INJECTION PILES INSTALLATION (м3) 286 ERECTION OF CONCRETE PREFABRICATED... READ MORE