Continuous Steel Casting Complex

Continuous Steel Casting Complex

AMOUNT OF WORK COMPLETED 96786 Excavation works (м3) 174214 Transportation of ground,slag,crushed stone,construction waste (t) 2826 Brick masonry (м3) 63592 Continuous concrete and reinforced concrete (м3) 691 Erection of concrete prefabricated constructions and reinforced prefabricated constructions (м3) 11692 Erection of metal constructions (t) 208118 Anticorrosive protection of metal constructions (м2) 3173 Equipment erection (t) Contact... READ MORE
Continuous steel casting complex №1

Continuous steel casting complex №1

SCOPE OF THE PERFORMED WORKS 62736 Development of soil (m3) 128350 Transportation of soil, slag, rubble, debris (t) 6050 Destruction of rubble, concrete and reinforced concrete structures (m3) 53705 Anticorrosive protection of metal structures (m2) 3846 Installation of metal structures (t) 7876 The device pierreinjection piles (m3) Contact Us 87500, Ukraine,Donetsk region,Mariupol, Mira Ave, 68а... READ MORE
RECONSTRUCTION OF SECTION-ROLLING SHOP. THE FIRST START-UP FACILITY (FIRST STAGE)

RECONSTRUCTION OF SECTION-ROLLING SHOP. THE FIRST START-UP FACILITY (FIRST STAGE)

ОБЪЕМЫ ВЫПОЛНЕННЫХ РАБОТ 69527 РАЗРАБОТКА ГРУНТА (м3) 118978 ПЕРЕВОЗКА ГРУНТА, ШЛАКОВ, ЩЕБНЕй, СТРОИТЕЛЬНОГО МУСОРА (тонн) 874 УСТРОйСТВО СВАйНЫХ ОСНОВАНИй (м3) 14200 ЖЕЛЕЗОБЕТОННЫЕ ФУНДАМЕНТЫ (м3) 1366 МОНТАЖ МЕТАЛЛОКОНСТРУКЦИй (тонн) 299 МОНТАЖ СБОРНЫХ БЕТОННЫХ И ЖЕЛЕЗОБЕТОННЫХ КОНСТРУКЦИй (м3) 3130 КИРПИЧНАЯ КЛАДКА (м3) 706 МОНТАЖ ТЕХНОЛОГИЧЕСКИХ ТРУБОПРОВОДОВ (тонн) 3037 МОНТАЖ ТЕХНОЛОГИЧЕСКОГО ОБОРУДОВАНИЯ (тонн)
Coverter Plant Construction

Coverter Plant Construction

DESCRIPTION OF FULFILLED WORKS 824074 EXCAVATION WORKS (м2) 819564 TRANSPORTATION OF GROUND, SLAG, CRUSHED STONE, CONSTRUCTION WASTE (T) 82704 DEMOLITION OF STONE, CONCRETE AND REINFORCED CONCRETE CONSTRUCTIONS (м3) 14554 BRICK MASONRY (м3) 27872 DISMOUNTING OF METAL CONSTRUCTIONS (т) 182191 CONTINUOUS CONCRETE AND REINFORCED CONCRETE (м3) 12304 INJECTION PILES INSTALLATION (м3) 286 ERECTION OF CONCRETE PREFABRICATED... READ MORE