Project info:

Construction of gas-turbine power station with the capacity of 303 mwt including 2 units of combined cycle in Alchevsk, Ukraine

Client
PJSC “Ekoenergiya”
Categories
Industrial Construction
Location
Alchevsk, Donetsk region,Ukraine

Description

In June 2013, the first power unit of a combined cycle gas turbine power plant with a capacity of 303 MW (2 blocks of 151.5 MW) was commissioned at PJSC Alchevsk Iron and Steel Works.

In Ukraine and the CIS it is the first station that allows to receive electricity by processing secondary energy resources (blast-furnace, coke and converter gases).

In combination with a combined-cycle power plant, gazagolders of blast furnace (100 thousand m3) and coke (50 thousand m3) gases are constructed. Today, work is underway to construct a gas-holder for converter gas (80,000 m3).

Scope of the performed works

72510

Development of soil (m3)

130518

Transportation of soil, slag, rubble, debris (t)

79800

Destruction of rubble, concrete and reinforced concrete structures (m3)

1496

Brickwork (m3)

19739

Monolithic concrete and reinforced concrete (m3)

5296

Installation of prefabricated concrete and reinforced concrete structures (m3)

2508

Installation of metal structures (t)

44642

Anticorrosive protection of metal structures (m2)

8443

Installation of equipment (t)

274

Electrical work (cable laid) (km)